Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

  • Tootja:Whirlpool
  • Mudel: WP D9 WBS EE
  • Saadavus: 2
  • 717€

-või-

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm | White
All
Aastane energiakulu 128 kWh
Aurufunktsioon No
Ekraan Yes
Ekraani tüüp Digital
Embeeded battery No
Energiatõhususe klass D
Gross depth (mm) 675.00 mm
Gross height (mm) 872.00 mm
Gross weight 39.00 kg
Gross width (mm) 655.00 mm
Isepuhastuv No
Kõrgus 85 cm
Kuivatamismaht 9 kg
Kuivatussüsteem Heat pump
Laius 60 cm
Lapselukk Yes
Müratase 64 dB
Net weight 37.00 kg
Packing quantity 1.00 pc(s)
Palette Qty 4 pc(s)
Paper/Pasteboard 1800.00 g
Plastic (No PET) 200.00 g
Producer Whirlpool
Producer product family Dryer Machine
Producer product name WP D9 WBS EE
Seadme tüüp Front loading
Sisuaken Yes
Sügavus 61 cm
Tare weight (kg) 2.00 kg
Toote värv White
Trumli maht 110 L
Trumli sisetuli Yes
Viitstardi taimer Yes
Viitstart (maksimaalne) 24 h
Võimsus 900 W
Volume (m3) 0.39 m
Warranty 24 month(s)
WEEE tax Yes